← EW2 Site WorksCONSTRUCTION RESEARCH · EW4 HISTORICAL ALTERATIONS
SITE HISTORY / CONCEPT STUDY

The ground remembers.

Explore this site in the new 3D Earthworks Inspector →

Two later building phases alter one original hillside. Every excavation remembers its original layer and donor stockpile, even after the same soil is reused and cut again. Occupied areas explicitly block excavation until a separately recorded retirement.

EW3a footing ground-seat study

HISTORICAL GROUND SECTION · NORTH OF ORIGINAL FOOTINGSLoading site…
Loading EW4 history…
Natural topsoil Natural subsoil Reused fill Rock Protected footprint (assumed)