EW-VIS1 + EW-VIS2 + EW-VIS3a / CONSTRUCTION FIRST
The ground has a history.
Orbit an excavated hillside, expose source-backed soil layers and replay each earthworks operation. Every column, material lot and spoil volume comes from V2—not a terrain mesh invented in the browser. Continue into EW3b to see six stepped footing stones and two independently founded pads appear in their recorded construction order.