← EW0 / EW1CONSTRUCTION RESEARCH · EW2 CUT & FILL
SITE & GROUND / CONCEPT STUDY

Cut. Fill. Direct water.

Watch a second hillside bench cut, tracked spoil reused in a small eastern apron, preparation recorded and two distinct design proposals evaluated: a retaining face and a falling drain route. Every stage replays the same source terrain.

Continue to EW4: historical alterations and spoil reuse →

SECTION THROUGH THE SOUTHERN EXCAVATION LINELoading site…
Loading site works model…
TopsoilSubsoilRock horizonRemoved soilPlaced subsoilRetaining proposalDrain proposal