← EW3a ground seatsCONSTRUCTION RESEARCH · EW3b
FOUNDATIONS / BUILT SITE ASSEMBLY

Build to the ground.

Actual stone solids, not post-render corrections. Replay a surveyed hillside setting-out, six touching stepped-strip segments and two independent stone pads. Their construction receipts point to exactly the same pinned site history.

Continue to EW3c — wine cellar construction →

SECTION THROUGH PINNED GROUND & AS-BUILT STONELoading…
Loading…
Current natural ground Built stone Verified geometric seat